Coal-to-Liquids Compression: Shaangu Power Wins a RMB 94.5 Million Five-Train Package for the Hami Project
Shaangu Power has been named first-place winner of a five-train centrifugal compressor package — recycle gas and recycle hydrogen machines rated to a million normal cubic metres per hour — for an 800,000 t/y indirect coal-liquefaction project in Hami.
Lead
Xi'an Shaangu Power Co. (西安陕鼓动力股份有限公司) has been awarded a RMB 94.5 million package of five steam-turbine-driven centrifugal compressor trains for the coal indirect-liquefaction unit at CHN Energy's Hami energy integration and innovation base, according to trade-press reports of the award notice.
Facts
The award. The notice of award was issued on 2 September 2026 by the project's tendering agency under CHN Energy's first 2026 centralised procurement of chemical-equipment compressors, naming Shaangu Power the winner at RMB 94.5 million. Earlier candidate-stage publication had listed the company as the first-ranked candidate. (Sources: China Chemical Industry News (中化新网), 2026-09-02; the candidate-result notice as carried by financial media, 2026-08-31.)
The project. The Hami base's indirect-liquefaction unit has a nominal capacity of 800,000 tonnes per year, producing LPG, naphtha, liquid paraffin and diesel from coal through gasification, shift, purification and Fischer–Tropsch synthesis. (Source: the same.)
The machines. Five centrifugal compressor trains, all steam-turbine driven: two Fischer–Tropsch recycle-gas trains (H₂/CO/CO₂/CH₄, inlet flow about 1.07 million Nm³/h, 2.66 MPa to 3.7 MPa); one refining recycle-hydrogen train (110,000 Nm³/h, 7.5 MPa to 8.6 MPa); one cracking recycle-hydrogen train (190,000 Nm³/h, 7.3 MPa to 8.85 MPa); and one feed-gas train (about 92,000 Nm³/h, 3.15 MPa to 6.0 MPa). (Source: the candidate-result notice.)
The qualification bar. The tender required bidders to hold at least one operating reference for a compressor train of one million Nm³/h or more on synthesis gas with a hydrogen share of at least 55 per cent and average molecular weight no greater than 17 — in service for over a year. (Source: the same.)
The maker's record. The coverage notes Shaangu Power's earlier deliveries in modern coal-chemical duty, including compressor trains for a methanol and ammonia project in Alxa delivered in 2021. (Source: China Chemical Industry News.)
Where this connects on this site
- Where big centrifugal trains sit against the positive-displacement families: Diaphragm vs Piston vs Screw Compressors: A Comparison Table
- Reading the gas first and the machine second: Specialty Gas Compressor Selection Guide: From Gas to Machine Type
- The selector: gascompressorselect.com
Sources
| # | Fact | Source |
|---|---|---|
| 1 | The notice of award dated 2026-09-02 under CHN Energy's first 2026 compressor procurement; Shaangu Power as winner at RMB 94.5 million; the five steam-turbine-driven trains and their service breakdown; the project's 800,000 t/y scale and product slate; the maker's prior coal-chemical references | 中化新网, 2026-09-02 — https://res.topqh.net/detail/91bf3965f18e090b406d433c18e03783/news |
| 2 | The train-level parameters (media, inlet flows, suction and discharge pressures, inlet temperatures, turbine types) and the qualification threshold (synthesis gas with hydrogen ≥55% and average molecular weight ≤17, one million Nm³/h or above, in service over one year) | 中标候选人公示(经新浪财经转载), 2026-08-31 — https://finance.sina.com.cn/stock/relnews/cn/2026-08-31/doc-iniqfear7324467.shtml |
Note on sourcing. This item reports trade-press coverage of a public tender result. We record the verifiable layer — the award, the value, the trains and their published parameters. We do not rank or recommend suppliers, and we do not repeat performance claims beyond the figures stated.
What the source does not state
The reports do not state the trains' stage counts, efficiencies or impeller arrangements, the delivery schedule, the site construction timeline, or the price breakdown across the five trains.
Update note
This item is a dated record of a publicly reported contract award. We append corrections rather than rewrite history; corrections are marked Correction with the date.